One
of many pre-cast concrete plank projects built in this area during the
70's, Ormond Holiday Club has been keeping up with the maintenance
necessary on this oceanfront facility. Plank reconstruction,
windowsill repairs, beam and column structural reinforcement, and
seawall repairs have all been apart of the ongoing restoration
requirements. The beach access steps have also been a point of
interest as it was noted that the undersides were displaying severe
corrosion. After the necessary shoring, deteriorated concrete removal
began, exposing corroded rebar which needed to be replaced. With
new steel epoxy dowelled in place, the polymer modified concrete was
poured in place. The seawall project is at an early stage. To
date, we have replaced areas of seawall cap, and have exposed the links
to the tie-backs, which anchor the seawall. The seawall tieback
areas are monitored twice yearly for any evidence of additional
cracking. Ormond Holiday Club has a system of regular checking of the
structural elements and a yearly/two yearly program of repair, of
which R&J is proud to be the approved contractor. |